Independent Renewable Energy Consulting

Know what will work before committing capital.

JTC connects production modelling, electrical demand, equipment, site constraints, economics and implementation into one practical recommendation. The objective is not to sell the largest system. It is to define the right next step.

Explore ServicesRequest a Consultation
Consulting services

Decision support from feasibility through operation.

PV

Solar Feasibility Studies

Site conditions, preliminary sizing, production, consumption offset, equipment assumptions and lifecycle economics.

Residential from $995
OG

Off-Grid Feasibility

Load analysis, autonomy, photovoltaic generation, storage, inverter/charger, MPPT and generator architecture.

Complex studies from $1,995
CI

Commercial Feasibility

Decision-grade analysis for businesses, institutions, farms, industrial facilities and larger properties.

Quoted individually
TA

Technical Advisory

Independent review of equipment, designs, project assumptions, procurement options and implementation decisions.

Scoped to the assignment
FA

Field Assessment & Troubleshooting

Observe, test, diagnose and prioritize the technical actions required for an existing system or unresolved problem.

Site-specific scope
PS

Project & Commissioning Support

Procurement support, contractor coordination, startup, verification, documentation and handover.

Project-specific scope
Decision-grade analysis

See what the analysis actually examines.

These images are extracts from an illustrative commercial feasibility model. They demonstrate the depth of analysis, not guaranteed outcomes for another property.

Sample solar production and facility consumption analysis
Energy Model

Production vs. consumption

Model generation against facility demand, month by month, to determine realistic energy offset.

Sample long-term electricity cost comparison
Cost Model

Cost of action vs. inaction

Compare long-term electricity costs under documented assumptions and escalation scenarios.

Sample solar financial analysis metrics
Financial Model

Investment performance

Evaluate payback, net present value, internal rate of return and lifecycle savings where applicable.

Sample values are project-specific and depend on equipment, costs, electricity rates, load profile, tax treatment, incentives, degradation, financing and other assumptions. Current work uses project-specific assumptions and current program rules.

Field assessment

Independent support when the answer is not obvious.

Existing systems rarely fail in one neat category. JTC can examine the complete operating context, identify likely causes and define the most useful next technical action.

System review
Architecture, equipment and operating history
Field observations
Visible conditions, constraints and failure indicators
Priority findings
What matters now and what can wait
Practical next step
Repair, testing, redesign or further investigation
01
Define the real question
Separate symptoms from the underlying technical decision.
02
Review the evidence
Documents, data, equipment, site conditions and operating history.
03
Test the assumptions
Identify what is known, uncertain, missing or inconsistent.
04
Prioritize action
Provide a practical, defensible path forward.
What a feasibility study can include

Enough depth to support a real decision.

Technical

  • Site and load conditions
  • Preliminary system sizing
  • Production modelling
  • Equipment and architecture
  • Losses, degradation and operating assumptions

Financial

  • Project-cost assumptions
  • Electricity offset and export
  • Lifecycle cash flow
  • Payback, NPV and IRR where appropriate
  • Sensitivity to key variables

Implementation

  • Permitting and utility considerations
  • Structural and electrical constraints
  • Procurement and contractor questions
  • Risk and uncertainty
  • Recommended next steps
Method

From initial question to practical next step.

01

Define

Clarify the decision, property, operating requirements and constraints.

02

Analyze

Build the technical and economic model using explicit assumptions.

03

Recommend

Present findings, risks, uncertainties and the most practical path forward.

Start with clarity

Need an independent answer before committing?

Send the location, type of property or system, electricity information where available, and the decision that needs to be made.

Request a Consultation